On the 12 Aug 2023 1pm to 4pm CatEagle Engineering team testing of new transmission equipment. 猫头鹰工程队测试新设备。 And the Equipment was immediately used for an NGO interpretation event. Helping the NGO to do the simultaneous interpretation on their limited space premises.